Gorgy Time recently welcomed international customer teams to its production site in La Mure, France, for a Factory Acceptance Test (FAT) related to a Rail project in Egypt.
This validation phase is a critical step in the deployment of time display systems for transport infrastructure. It ensures that the equipment complies with project requirements, performs as expected, and integrates seamlessly into the technical environment before installation on site.
Why is a Factory Acceptance Test Essential for Rail Projects?
In modern railway infrastructure, accurate and reliable time is fundamental to safe and efficient operations. Time synchronisation systems ensure consistency across multiple subsystems, including passenger information systems, operational supervision, CCTV, access control, IT networks and other operational equipment.
A Factory Acceptance Test (FAT) enables project stakeholders to:
- Validate the correct operation of the equipment;
- Verify compliance with technical specifications;
- Confirm interoperability with the project's various systems;
- Secure the final stages before commissioning.
This process helps minimise deployment risks and ensures a high level of operational reliability once the system is in service.

Gorgy Time's Expertise Supporting Rail Projects Worldwide
For more than fifty years, Gorgy Time has been designing and manufacturing time synchronisation and clock display solutions for critical environments.
Our solutions are deployed across numerous projects in the transportation, industry, energy, defence and public infrastructure sectors.
For railway projects, our teams support customers throughout every stage of the project lifecycle:
- Requirements analysis
- System architecture design
- Equipment manufacturing;
- Factory testing and validation through Factory Acceptance Tests (FAT)
- Integration support
- Site Acceptance Testing (SAT)
- Assistance through to commissioning.
This end-to-end expertise enables us to meet the stringent quality, reliability and safety requirements expected in modern transport networks.
Discover our full range of services
International Projects Managed from La Mure in France
Hosting this FAT demonstrates Gorgy Time's ability to support international Rail projects from its historic production site in La Mure, located in the heart of the French Alps.
Beyond technical validation, these meetings provide valuable opportunities for collaboration, knowledge sharing and the exchange of expertise between project teams, helping to ensure successful project delivery.
Gorgy Time: Supporting the Transport Infrastructure of Tomorrow
As transport networks become increasingly digitalised and interconnected, time synchronisation has become a strategic component in ensuring operational performance, efficiency and safety.
Thanks to its expertise as a manufacturer and its comprehensive project support approach, Gorgy Time contributes to the development of reliable, high-performance and sustainable Rail infrastructure worldwide.
A Collective Success
The success of a Factory Acceptance Test relies on the commitment and expertise of all stakeholders involved. Gorgy Time would like to thank everyone who contributed to this validation phase for their professionalism, dedication and the quality of collaboration throughout the process.
These partnerships play a vital role in ensuring the success of Rail projects and supporting the development of reliable transport infrastructure around the world.